About the event

Every year, the Inland Waterways Association runs a major event during the summer. In 2011, it's at Shobnall Fields, Burton on Trent, on the Trent and Mersey Canal. For the first time for a long while, it will be from the Friday to the Sunday of the last weekend in July, rather than the Late Summer Bank Holiday.

Like a lot of other volunteers, we'll be there for three weeks, starting on Saturday 16th July. Our main contribution will be editing and producing the daily newsletter which is circulated to the boaters, campers and exhibitors at the Festival, starting on the Thursday before.

Disclaimer

Note: this is an entirely personal account of our time helping to set up and run the Festival. It's not an official IWA site; please use the link above for that.
Showing posts with label Moorings. Show all posts
Showing posts with label Moorings. Show all posts

Wednesday, 20 July 2011

Steady progress on Day 5

After the thrills and spills of the day before, yesterday was a day for a steady effort. It's always the same in the first week; it can be very frustrating not having a great deal to do and knowing that things will be much more hectic as the opening approaches.

Work has gone on preparing the main moorings, and the various cabins continue to turn up. One challenge waiting for the main wrg camp is readying the main car park. Marston's have very kindly donated the use of some spare land of theirs by the canal, but it needs just a touch of sorting out:


The entry doesn't look too bad...
It needs a bit of strimming and so on, that's all. It's when you get inside that the scale of the task becomes apparent:

Heaps of hard core
These two heaps have to be levelled off and spread out over the unpaved areas to make a usable parking area. Mike Sumner, aka site 3, is a professional contractor for this sort of job, as it happens, and estimates about two days work for a Merlo telehandler with a big bucket. We shall see!

Meanwhile, Mo and Martin, aka the Americans, started improving the towpath edge for the moorings, whilst another team on board Shropshire Lass tackled the vegetation on the offside:

The problem
This area has to be cleaned up so that boats can be moored two abreast on the towpath and still leave room for passing craft.

Here comes Mo with a rake
 I'm not sure if I've explained this before. Mo is from Scotland, and she and Martin live in Iver in Bucks. When they turned up at their first National camp, the first person they met misheard Iver as Iowa, and told everyone else that two Americans had arrived. They've been known as the Americans ever since.

Mo using a wheeled strimmer while Martin rakes
On the offside, much more aggressive tactics were called for:

Getting stuck in

There are four blokes in there somewhere.
It just shows what volunteers can achieve with basic tools and some goodwill.

Meanwhile, elsewhere on site:

Some musty hi vis vests were washed and hung out to dry

The Brew Hut cabin was delivered, but with the wrong key, seemingly.

Towing Glenfield
Bob Metcalfe is a stalwart wrgie, but couldn't be with us this week as he has his living to earn. He'd brought his boat, though, and the Waterspace team towed it into its proper mooring, so as not to leave it alone and undefended on the parkside moorings.

Monday, 18 July 2011

A damp day 3

It didn't rain with quite the abandon of the day before yesterday, but it still drizzled on and off. It wasn't enough to impede the work, and the ground remains firm and hard; it's been such a dry year, there's a lot of capacity to absorb the rain.

We made several trips to the site; on the first, we heard that there had been some incursions overnight. The fence had been broken in four places, and youngsters careered about, but no damage was done. The fact that there were three German Shepherd Dogs commenting loudly may well have discouraged the intruders from hanging about.

First job for wrg, then, was to re-secure the line, and walk the whole of the fence checking that all the clips were tight. It may become necessary to use anti-lift clips, that tie the panels down to the blocks, as we did at Pendeford a few years back. Siting the Festival in the middle of a town should increase the footfall, obviously, but at the cost of greater security problems. The security firm, Intaguarding, will begin work today, so that should help.

Matters otherwise progressed steadily; the sense is that we're well ahead with the tasks, as it often is at the stage; it's as the opening approaches that the pressure mounts. The Site Director, Dave Hearnden, aka Moose, has arrived, and will be spending a lot of his time walking around, accompanied by two of the aforesaid GSDs.

Plumb Bob's Arch
This is true in several ways, but in this case it was his chosen solution to get the water supply to the far end of the field past the entrance to admin village. There's some discussion about appropriate decoration; fairy lights or a pair of amber beacons?

The Comms team
 Peter and Pat are the comms team, running phone lines around the site. They're very shy, so I haven't shown their faces ;).

Workers' moorings nearly ready
 An awful lot of strimming, scrub clearing and hole filling has been done in two days to make the moorings ready to occupy today.

Plumber in a tree
 Plumb Bob asked me why I take so many pictures of him. He didn't seem entirely convinced by my explanation that the plumbing team works so hard.

Security encampment
The security team from Intaguarding will be living on site for the duration, enabling them to respond to any emergency mob handed.

Unloading a the big genset from the beaver tail.
Wrg has two gensets of its own, this larger one contained in a box trailer, and a small towable. When Bungle went to collect this one, he loaded it onto the beaver tail truck, then opened up the back doors to check all was secure inside before setting off. He was confronted by an enormous wasps nest, about the size of a basketball.

He's a very large bloke, but I'm told only milliseconds passed before he was back on the ground and moving away from the truck.

Later on, the seriously large generators will arrive from the contractor who's doing the main supply to the site.

Wednesday, 18 August 2010

First Tuesday

Those three week workers (BODS in the jargon; it stands for Build Operate Dismantle) with boats had been told that the swing bridge guarding access to the lake moorings would be open between 8 and 9 in the morning yesterday, and then again between 5 and 6. The big question was which slot to choose. The Waterspace team has installed short finger pontoons, with space for four, five or six boats between them as the bank edge dictates.

Moose as Safety Officer testing a finger pontoon

First thing, I went and spoke to Mike Moorse who was organising the whole thing, and found out that we were in the middle of a trot of five. This implied that we would be better to go in later rather than earlier, but on the way back to the boat, I saw Wandering Whimbrel, the boat we would be tied next to, heading in, so we decided to follow.

This would have been fine, but by the time we got into the lake, things had been changed from the rejig of the rejigged plan, as some boats had proved to deep for their allocated spot. Having come in beside Wandering Whimbrel as instructed, I had to pull out again and reverse into a different spot. Now we were against a short boat with a cruiser stern, and physically couldn’t leave Sanity Again. This was sorted temporarily, and during the day, the Waterspace team built a new pontoon between us and our neighbour, Amy Em.

This will be extended today, to give Amy Em a better exit, as one of her crew is disabled. We’ve ended up with a very nice mooring with a good pontoon, so all’s well that ends well.

Much of the rest of the day was spent putting fencing up and taking it down, as will today, I suspect. The other big task for WRG now is brushcutting around the mooring sites out on the river, and on the other side of the lake.

I must say, the fencing has been even more frustrating than usual this year. (Mind you, I say this every year.) Some of the adjustments have been as a result of conditions on the ground, but many of them could have been avoided with better planning and marking out. It sometimes feels as if the site team don’t appreciate the sheer hard work it is erecting long runs of Heras fencing.

The cabins have arrived for the WRG compound, being the one which will be the kitchen and one which will be the brew hut. Only cooks are allowed in the kitchen, except by invitation, but anyone wrgie will be able to use the brew hut. It will contain a pair of Burco boilers, toasters, washing up facilities and a supply of bread, biscuits and tea and coffee.

Positioning the kitchen cabin


Red shirt/Blue shirt liaison in progress

At the end of the day, there was a celebratory tea party for Alan and Rosemary Whiffen, two longstanding volunteers who have just celebrated their Golden Wedding. It’s typical of the Festival volunteers that such an event should not go unmarked.


Alan and Rosemary cutting the cake

Two halves of a shallop which will form part of the display on the lake.

A reproduction of Elizabethan executive transport on the Thames, this one appeared in the film version of A Man for All Seasons which starred Paul Schofield.